top of page

Transport Optimization Strategy on O&G Infrastructure

Updated: Oct 22

Client:

A large subsidiary of NOC managing heavy vehicle fleets across multiple production and construction sites.


Challenge:

Frequent vehicle accidents, route drifts, and mechanical failures led to major downtime, safety incidents, and inefficiency in daily operations.


Approach:

SAGIAR conducted a comprehensive process optimization program:

  • Mapped the entire vehicle movement and maintenance process.

  • Introduced telematics data analysis to track routes, driver behavior, and downtime causes.

  • Designed new control protocols and maintenance scheduling.

  • Implemented accountability dashboards linked to performance KPIs.

  • Deployed 3 supervising teams on the ground for .


Impact:

  • Vehicle downtime reduced by 70%.

  • Safety incidents dropped to near-zero levels.

  • Annual logistics cost savings of ~15%.



 
 
 

Comments


© 2025 SAGIAR. All rights reserved.

Personal data submitted through this website is used solely to respond to inquiries and is not shared with third parties.

Legal notice.

bottom of page