Transport Optimization Strategy on O&G Infrastructure
- Dmitry Linkov
- Sep 3
- 1 min read
Updated: Oct 22
Client:
A large subsidiary of NOC managing heavy vehicle fleets across multiple production and construction sites.
Challenge:
Frequent vehicle accidents, route drifts, and mechanical failures led to major downtime, safety incidents, and inefficiency in daily operations.
Approach:
SAGIAR conducted a comprehensive process optimization program:
Mapped the entire vehicle movement and maintenance process.
Introduced telematics data analysis to track routes, driver behavior, and downtime causes.
Designed new control protocols and maintenance scheduling.
Implemented accountability dashboards linked to performance KPIs.
Deployed 3 supervising teams on the ground for .
Impact:
Vehicle downtime reduced by 70%.
Safety incidents dropped to near-zero levels.
Annual logistics cost savings of ~15%.




Comments